Attention Residents
Please note the following update to the Aurora building painting project.
13/3/19-20/3/19 : All apartments level 52 – 67 (sky homes and penthouses) – Window Privacy
The rope access team will be carrying out a pressure wash to the exterior of the building in preparation for painting. Although these apartments have enclosed balconies some minor water ingress may be present. We ask that residents are mindful of this and also that staff will be outside their windows during working hours 7.30am – 4pm Monday to Friday.
13/3/19-22/7/19 : Level 7 apartments Exclusion Zone
The rope access team will require that all level 7 balconies are made an exclusion zone for the above time frame (13/3/19-22/7/19 Monday to Friday 7am-4pm). This means that residents will have to remain off their balconies during this time and we also ask that they ensure the retractable awnings are kept closed.
20/3/19-29/5/19 : Level 7 – 51 apartments – Balconies cleared of furniture – Privacy
Types 1&6
The rope access team will commence pressure washing and painting of the 1 & 6 balconies. Weather permitting we will be carrying out 10 levels of each style per week simultaneously. We ask that residents are aware and that balconies are cleared of furniture. Weekly updates will be provided of progress similar to the rear balconies.
Types 2 – 5
In regards to the 2-5 style balconies these will be carried out simultaneously with an aim to commence and complete 5 levels (20 balconies per week)
Thank you for your cooperation.
Programmed Property Services